Refurbishment and Building Structure Works Policy
1. Purpose
The purpose of this policy is to ensure that any refurbishment, structural alteration, or building works carried out at {{org_field_name}} are planned, implemented, and managed efficiently, safely, and in full compliance with the Regulation and Inspection of Social Care (Wales) Act 2016, The Regulated Services (Service Providers and Responsible Individuals) (Wales) Regulations 2017, and CIW expectations regarding premises, health and safety, and service continuity. The policy ensures that all refurbishment or structural work preserves the safety, privacy, dignity, and well-being of individuals using the service and minimises disruption to their daily lives. It outlines how we ensure suitable risk management, effective communication, contractor oversight, and regulatory compliance throughout all building projects, whether minor or major.
2. Scope
This policy applies to all structural and internal refurbishment projects at {{org_field_name}}, including but not limited to redecoration, installation of new equipment or systems, room reconfigurations, flooring replacement, plumbing or electrical upgrades, extensions, adaptations for accessibility, and health and safety upgrades. It applies to staff, contractors, maintenance personnel, visitors, and any external professionals involved in the planning or delivery of the work. It also guides the Registered Manager and Responsible Individual in managing compliance and reporting to CIW.
3. Related Policies
This policy should be read in conjunction with:
CHW04 – Good Governance
CHW11 – Safe Care and Treatment Policy
CHW16 – Health and Safety at Work Policy
CHW17 – Infection Prevention and Control Policy
CHW18 – Risk Management and Assessment Policy
CHW19 – Emergency and Business Continuity Plan
CHW20 – Fire Safety and Evacuation Procedures
CHW24 – Management of Accidents, Incidents, and Near Misses Policy
4. Planning, Premises Suitability and Risk Assessment
Before any refurbishment, structural alteration or building work is commissioned or commenced, the Service Provider must ensure that the proposed work has been assessed to confirm that the premises will continue to be suitable for the regulated service and consistent with the current Statement of Purpose.
The Registered Manager and Service Provider, with oversight from the Responsible Individual and with advice from appropriately competent professionals where required, must consider whether the proposed works will affect:
- the ability of the service to achieve the aims and objectives set out in the Statement of Purpose;
- the assessed care and support needs of individuals using the service;
- individuals’ ability to achieve their personal outcomes;
- accessibility and independent movement around the premises;
- privacy, dignity and confidentiality;
- bedrooms, communal areas, bathrooms, toilets and other facilities used by individuals;
- lighting, heating and ventilation;
- fire precautions, compartmentation, fire doors, alarms, emergency lighting, escape routes and evacuation arrangements;
- security and protection from unauthorised access;
- infection prevention and control;
- water, electrical, gas, mechanical and other building systems;
- the safe installation, location and use of equipment;
- staffing arrangements and staff access to individuals;
- continuity of care and support; and
- the structural condition, maintenance, cleanliness and general safety of the premises.
A written risk assessment must be completed before work begins and must identify risks to individuals, staff, visitors and contractors. The assessment must cover, as applicable, dust, noise, vibration, fumes, hazardous substances, infection risks, temporary loss of utilities, restricted access, temporary changes to fire precautions, movement of contractors and materials, security, safeguarding, temporary relocation and interruption to normal care and support.
Individuals’ assessed needs must be taken into account when premises are renovated or adapted and, where possible, individuals must be enabled to express their views about changes which affect the environment in which they live.
A written works plan must be prepared proportionate to the nature and scale of the project. It must identify the scope of work, responsible persons, competent contractors and designers, required statutory approvals, anticipated timescales, areas affected, risk-control measures, contingency arrangements and arrangements for maintaining safe care and support throughout the works.
Where the proposed work may alter the nature, layout, capacity or operation of the regulated service, the Service Provider must also consider whether the Statement of Purpose requires revision and whether notification to Care Inspectorate Wales or other persons is required before the proposed change takes effect.
No work must commence until the Service Provider is satisfied that applicable statutory approvals, notifications, risk-control measures and arrangements for continuity and safety are in place.
5. Notification to Care Inspectorate Wales and Statutory Approvals
The Service Provider is responsible for ensuring that Care Inspectorate Wales is notified of events which are required to be notified under Regulation 60 and Schedule 3 of The Regulated Services (Service Providers and Responsible Individuals) (Wales) Regulations 2017, as amended.
Where the premises are, or are proposed to be, significantly altered or extended, the Service Provider must notify Care Inspectorate Wales without delay using the notification arrangements specified by Care Inspectorate Wales. Notifications must contain sufficient information about the proposed alteration or extension and must be submitted through CIW Online where this is the notification method required by Care Inspectorate Wales.
The Service Provider must also notify Care Inspectorate Wales where additional premises are, or are proposed to be, acquired for the operation of the regulated service.
The Service Provider must consider, before work begins, whether the proposed refurbishment, alteration or extension requires the Statement of Purpose to be revised. Where a revision is required, the Service Provider must comply with Regulation 7, including notifying:
- Care Inspectorate Wales;
- individuals using the service;
- the placing authority, where relevant; and
- any representative, unless notification would be inappropriate or inconsistent with the well-being of the individual.
Unless the immediate-change provisions in Regulation 7 apply, notification of a revision to the Statement of Purpose must be given at least 28 days before the revised Statement of Purpose is to take effect.
All refurbishment and building work must comply with applicable planning legislation, the Building Regulations 2010 as they apply in Wales, building-control requirements, fire-safety legislation, health and safety legislation and any other statutory consent applicable to the particular works.
From 1 July 2026, where building work falls within the revised Welsh building-control dutyholder regime, the Service Provider or other person legally acting as the client for the building work must comply with the applicable client duties under the Building Regulations 2010. This includes ensuring appropriate arrangements are made for planning, managing and monitoring the project so that the building work complies with applicable building regulations and ensuring that designers and contractors appointed to the project have the necessary competence and organisational capability.
Where the building is a higher-risk building for the purposes of the Welsh design and construction building-control regime, the Service Provider must ensure that the additional requirements applying to higher-risk building work are identified and complied with before work begins.
For these purposes, a care home may fall within the higher-risk building regime where the building is at least 18 metres in height or has at least seven storeys and satisfies the applicable statutory use criteria.
Where higher-risk building work applies, building control approval must be obtained from the building control authority before the relevant building work starts, except where a statutory exemption, emergency repair provision or applicable transitional provision applies.
Evidence of all notifications, permissions, approvals and correspondence with regulatory or statutory bodies must be retained with the project records.
6. Communication, Consultation, Capacity and Consent
Before refurbishment or building work begins, the Registered Manager must ensure that individuals using the service, staff and other relevant persons are given appropriate information about works that may affect them.
Information must, as appropriate, explain:
- the nature and location of the work;
- the anticipated start date and duration;
- areas of the home that will be unavailable or subject to restricted access;
- temporary changes to routines, facilities or access arrangements;
- temporary changes to fire or evacuation arrangements;
- expected noise, dust or other disruption;
- arrangements for maintaining care and support; and
- who individuals or their representatives may contact with questions or concerns.
Information must be provided in a language, style, presentation and format appropriate to the individual’s communication needs and level of understanding, and appropriate support must be provided where necessary to enable the individual to understand the information.
Individuals must, where possible, be consulted about changes to the environment which directly affect them, particularly changes to their bedrooms, personal spaces, communal facilities or normal access arrangements.
Where an individual needs to be temporarily moved to another bedroom, area or location because of building works, the Service Provider must ensure that the decision is lawful, necessary and consistent with the individual’s care and support needs and well-being.
Where the individual has capacity to make the relevant decision, their valid consent must be sought where consent is legally required.
Where there is reason to doubt an individual’s capacity to make the particular decision, capacity must be considered in accordance with the Mental Capacity Act 2005. Where the individual lacks capacity, any decision must be made in accordance with the statutory principles and best-interests requirements of the Mental Capacity Act 2005 and any other applicable legal authority.
Where temporary arrangements amount to, or may amount to, a deprivation of liberty or materially alter an existing authorised deprivation of liberty, the Registered Manager must obtain appropriate advice and ensure that the necessary lawful authority is in place.
The reason for any temporary relocation, consultation undertaken, capacity or consent considerations, decision-making process, risk assessment and arrangements for maintaining the individual’s care and support must be clearly recorded.
7. Minimising Disruption and Promoting Safety
Work is planned to minimise disruption to individuals’ daily lives, care routines, and emotional well-being. Where possible, noisy or disruptive activities are scheduled for times when they cause the least impact. Sensitive areas such as lounges, bathrooms, and bedrooms are refurbished in phases to ensure alternatives are always available. Dust, noise, fumes, and movement of materials are controlled through physical barriers, signage, ventilation, and regular cleaning. Contractors are briefed on safeguarding, confidentiality, infection control, and dignity protocols and must wear identification while on-site.
8. Appointment, Competence and Management of Designers and Contractors
Only contractors, designers and other professionals who are competent to undertake the work for which they are appointed may be engaged.
Before appointment, the Service Provider, where acting as the client for the purposes of applicable building legislation, must take all reasonable steps to satisfy itself that designers and contractors have the skills, knowledge, experience and behaviours, and where relevant the organisational capability, necessary to undertake their functions in accordance with applicable building regulations.
The Service Provider must obtain and retain evidence appropriate to the work being undertaken, which may include:
- relevant qualifications, registrations and professional memberships;
- competence and experience;
- appropriate insurance;
- risk assessments and method statements;
- health and safety arrangements;
- evidence relating to specialist systems or equipment;
- references or previous relevant work; and
- any licences, approvals or certifications required for the work.
Where the building-control dutyholder requirements under the Building Regulations 2010 apply and there is more than one designer or contractor working on the project, or it is reasonably foreseeable that more than one designer or contractor will work on the project, the client must appoint in writing:
- a principal designer to be in control of the design work; and
- a principal contractor to be in control of the building work.
Where there is only one designer, that designer will fulfil the principal designer role for the purposes of the applicable building-regulations dutyholder requirements. Where there is only one contractor, that contractor will fulfil the principal contractor role.
Appointments made for the purposes of the Building Regulations 2010 must not be confused with appointments required under the Construction (Design and Management) Regulations 2015. The same person or organisation may undertake both roles where legally permissible and competent to do so, but the relevant appointments and responsibilities must be clearly identified and recorded in writing.
For projects involving higher-risk building work, the Service Provider must ensure that the additional competence, information-management, change-control, mandatory occurrence reporting and building-control requirements applicable to the client, principal designer and principal contractor are complied with.
Contractors working within occupied areas of the care home must be managed so that individuals remain safe and their privacy, dignity and confidentiality are protected. Contractors must comply with the service’s requirements concerning access, identification, safeguarding, infection prevention and control, fire safety, confidentiality and conduct.
Any requirement for a Disclosure and Barring Service check must be determined according to the activities the contractor will undertake and the nature and frequency of their contact with individuals. Contractors must not be given unsupervised access to individuals where this would be inappropriate or would expose individuals to avoidable safeguarding risk.
The Registered Manager or a nominated competent person must monitor building work affecting the occupied care environment and must take prompt action where work is unsafe, does not comply with agreed controls, adversely affects individuals or creates a risk to the continued safe operation of the service.
9. Infection Prevention and Waste Disposal
All refurbishment or building works are planned and carried out in line with CHW17 – Infection Prevention and Control Policy. Measures are taken to prevent cross-contamination, especially in care and communal areas. Barriers, signage, and cleaning protocols are enforced, and work areas are kept clean and debris-free. Waste materials are disposed of safely and in accordance with environmental and health guidelines. Tools and equipment are secured when not in use.
10. Fire Safety and Emergency Planning
Where building works impact fire exits, alarms, or evacuation routes, temporary arrangements are put in place and clearly communicated to all staff, residents, and contractors. The Fire Safety Lead, {{org_field_the_fire_safety_lead_name}}, ensures that fire safety procedures remain robust, with any adjustments documented and tested. Emergency drills are conducted if changes affect layout or exits. Any changes to the fire safety system are commissioned and certified by a qualified fire safety engineer.
11. Completion, Statutory Approval, Handover and Reoccupation
On completion of refurbishment or building work, the Service Provider must ensure that the completed work is inspected and that the affected area is not returned to normal care use until it is safe and suitable for its intended purpose.
The completion process must include, as applicable:
- confirmation that the agreed scope of work has been completed;
- identification and resolution of defects affecting safety or suitability;
- confirmation that the premises remain suitable for the service described in the Statement of Purpose;
- confirmation that the environment meets the assessed care and support needs of individuals who will use it;
- confirmation that access, lighting, heating, ventilation, security and sanitary facilities are appropriate;
- confirmation that required fire precautions, alarms, emergency lighting, escape routes, compartmentation and fire doors are operational;
- confirmation that water, electrical, gas, mechanical and other building systems affected by the work are safe and operational;
- appropriate cleaning and infection-prevention checks;
- updating of relevant risk assessments, fire risk assessments, evacuation arrangements and maintenance schedules;
- receipt of required commissioning certificates, test certificates, warranties, operating manuals, drawings and statutory approvals; and
- briefing or training of staff on new layouts, systems or equipment before those systems or areas are brought into use.
Where building-control approval, inspection, certification or other statutory sign-off is required, the Service Provider must ensure that the applicable process has been completed and evidence retained.
Where the project constitutes higher-risk building work, the client must comply with the completion requirements of the Building (Higher-Risk Buildings Procedures) (Wales) Regulations 2025, including applying to the building control authority for the required completion certificate or, where permitted and previously approved, partial completion certificate.
The required higher-risk building completion documentation must be collated and submitted in accordance with the applicable regulations and building-control requirements. Required information must also be handed over to the person responsible for the building under applicable fire-safety legislation.
Where any part of a higher-risk building is intended to be occupied or brought back into use before the whole project is completed, this must only take place in accordance with an approved partial completion strategy and the applicable partial completion certification requirements.
Any restrictions imposed by the building control authority, fire and rescue authority or another statutory body must be complied with before the affected area is brought into use.
Where significant alterations or extensions have previously been notified to Care Inspectorate Wales, any further information or updated Statement of Purpose required as a consequence of the completed works must be provided in accordance with the applicable CIW and regulatory requirements.
12. Documentation and Records
The Service Provider must maintain sufficient records to demonstrate that refurbishment and building works have been properly planned, authorised, managed and completed and that applicable regulatory and statutory requirements have been met.
Records must include, where applicable:
- the initial proposal and approved scope of works;
- assessments of the impact of the work on the regulated service and Statement of Purpose;
- risk assessments and method statements;
- consultation and communication records;
- records relating to any temporary relocation of individuals;
- planning permissions and other statutory consents;
- building-control applications, approvals, notices, inspection records and completion documentation;
- notifications and correspondence with Care Inspectorate Wales;
- revised Statements of Purpose and evidence of required notifications;
- details and competence evidence for contractors and designers;
- written appointments of principal designers and principal contractors where required;
- Construction (Design and Management) Regulations documentation where applicable;
- insurance documentation;
- fire-safety assessments and relevant fire-system documentation;
- infection prevention and control arrangements;
- drawings and specifications;
- testing, commissioning and compliance certificates;
- equipment manuals, warranties and maintenance information;
- defect records and evidence of remedial action;
- handover and final inspection records; and
- staff information, instruction or training records relating to changed premises, equipment or systems.
Where the project involves higher-risk building work, the Service Provider must ensure that the information required by the Building (Higher-Risk Buildings Procedures) (Wales) Regulations 2025 and associated building-control requirements is created, maintained, updated and transferred as required. This includes applicable building-control approval documents, agreed plans, change-control information, mandatory occurrence reporting information, compliance declarations, fire and emergency information and completion documentation.
Required building and fire-safety information must be transferred to the person legally responsible for holding that information where the legislation requires such a handover.
Records relating to the regulated service must be stored securely and must be made available to Care Inspectorate Wales or another statutory authority where there is a lawful requirement to provide them.
Project records must be retained in accordance with applicable statutory retention requirements and the organisation’s records-management arrangements, provided that organisational retention periods must not be shorter than any statutory period applying to the particular record.
13. Policy Review
This policy will be reviewed annually or sooner if there is a change in legislation, guidance from CIW or local authorities, or following a significant refurbishment project or incident. The review will be led by the Registered Manager in consultation with the Responsible Individual, maintenance lead, and Health and Safety representative. Any updates will be shared with staff through meetings, training, and internal communications.
Responsible Person: {{org_field_registered_manager_first_name}} {{org_field_registered_manager_last_name}}
Reviewed on: {{last_update_date}}
Next Review Date: {{next_review_date}}
Copyright © {{current_year}} – {{org_field_name}}. All rights reserved.